Our Clients

AVM Engineering
AVM Engineering
IDOS Activity : Productivity Improvement through Lean (Muda,Mura,Muri Elimination), Line Balancing
Malkar Industries
Malkar Industries
IDOS Activity : Systematic Layout Planning (SLP), 5S & VM Trainings and Implementation
Protigo : German MNC
Protigo : German MNC
IDOS Activity : MOST Based VA/NVA Study and Improvements
Eros Elevators
Eros Elevators
IDOS Activity : Lean Line development For Stackers @ Eros With Welding Automation For doubling O/p to 100
Hamilton India
Hamilton India
IDOS Activity : LEAN Experts Training & Workshop with Implemented Projects by in-house Team, Low Cost Automations (LCA) Designed and Installed For ROI < 1.5 Yrs
Siemens Ltd
Siemens Ltd.
IDOS Activity : Lean Experts In-house Trainings, Lean Operator Workshops
Groz Beckert Asia Pvt Ltd
Groz Beckert Asia Pvt Ltd, Chandigarh
IDOS Activity : Ergonomic WP design with RULA and REBA analysis, Productivity Improvement of > 40%
KORES India
KORES India: Greenfield Plant @Jammu (Tempra colours, Dough, Clay, Inks)
Kinam Engineering
Kinam Engineering : Lean line for Heat Exchangers
IDOS Activity : LEAN Deployment for Non Std Hes And Stores KAN BAN deployment
Parveen Industries
Parveen Industries
IDOS Activity : 5S & VM Implementation
Nissan Scientific Products Pvt. Ltd
Nissan Scientific Products Pvt. Ltd.
IDOS Activity : New Org Structure Deployment.Setting of KRA/KPI and MIS
Technofour Combines
Technofour Combines
IDOS Activity : SMED project for Press Shop with 45% Improvements from average 70 minutes to 40 Minutes for Changeovers
Globus International
Globus International
IDOS Activity : Green Field Project With SLP and Process Improvements Implementation for Paper Industry
Thomas & Brian
Thomas & Brian
IDOS Activity : Brown field New Factory Project for Additional products and amalgamated New Units
Jupiter Clamps
Jupiter Clamps
IDOS Activity : Inventory And Materials Handling With 28% Improvements
Nandan GSE
Nandan GSE
IDOS Activity : Systematic Layout Planning For New Layout of Modified Factory With MHE planning and Material Handling Concepts And System
Bell Fuid Tech (Bell Fluidtechnics Private Limited)
Bell Fuid Tech (Bell Fluidtechnics Private Limited)
KBI Footware
KBI Footware
IDOS Activity : Optimisation of Layout and Materials Handling for Multi Storied Factory
High Spirit Commercial Ventures PVT. LTD.
High Spirit Commercial Ventures PVT. LTD.
IDOS Activity : Three Flooried Warehouse Design and Implementation With Conveyors for In and Out with WMS deployment 70% Space productivity
Tibrewala Electormech PVT Ltd
Tibrewala Electormech PVT. LTD. (TIBCO), Roorkee
IDOS Activity : Green Field Design for 6 Lac Fans per month in new additional Factory Location (40% less space)
Chhaparia Industries Pvt. Ltd.
Chhaparia Industries Pvt. Ltd.
IDOS Activity : Design and Deployment Of PT, Powder Coating, Riveting, Winding, Varnishing, Assembly And Packaging With LCA with 32% Manpower Optimisation
Agarwal Industries
Agarwal Industries
IDOS Activity : Inventory Reduction, Productivity Improvement, Delivery Lead Time reduction, Waste(Rework & Rejection) Reduction
Pragatee Switchgears
Pragatee Switchgears
IDOS Activity : Inventory Reduction, Productivity Improvement, Delivery Lead Time reduction, Waste(Rework & Rejection) Reduction
Atomberg Technologies
Atomberg Technologies
IDOS Activity : Green field project planning For new Factory Setup in Pune
Selec Controls Pvt. Ltd.
Selec Controls Pvt. Ltd.
IDOS Activity : Digital Lean Deployment For RM warehouses with 20% Manpower Optimisation
Potential Engineering
Potential Engineering (Potential Electric)
IDOS Activity : Lean SFM (Shop Floor Management) Deployment for Water Treatment Equipments
Orient Electric
Orient Electric